Our projects

Read about some of the projects Beerenberg has been involved in. 

Advantages of a robot at Gullfaks B

Removal of approx. 64m² of deck covering in the container landing area in connection with the installation of a new module was carried out with a robot.

Les mer

Complex rigging with rope access technique

In Beerenberg, surveying, mechanical work, cold cutting with diamond wire, advanced rigging operations and access can be carried out by one and the same work team.

Les mer

Rehabilitation of Tunheim bridge

Tunheim bridge on Tynset has now been fully rehabilitated after the municipality was found to have suffered major damage and defects that affected load-bearing capacity, traffic safety and service life.

Les mer

New hand washing station at Gullfaks C

Architectural work in connection with the rehabilitation and construction of a new handwashing station outside the canteen at Gullfaks C.

Les mer

Robotic cleaning of anchor chains on Gjøa

Beerenberg performs an automated method for cleaning and inspecting anchor chain at sea.

Les mer