Robotic maintenance on Peregrino B
Beerenberg has carried out maintenance on 16 conductors in the area under the platform's basement deck on Peregrino B in Brazil.
Advantages of a robot at Gullfaks B
Removal of approx. 64m² of deck covering in the container landing area in connection with the installation of a new module was carried out with a robot.
Complex rigging with rope access technique
In Beerenberg, surveying, mechanical work, cold cutting with diamond wire, advanced rigging operations and access can be carried out by one and the same work team.
Rehabilitation of Tunheim bridge
Tunheim bridge on Tynset has now been fully rehabilitated after the municipality was found to have suffered major damage and defects that affected load-bearing capacity, traffic safety and service life.
New hand washing station at Gullfaks C
Architectural work in connection with the rehabilitation and construction of a new handwashing station outside the canteen at Gullfaks C.
Robotic cleaning of anchor chains on Gjøa
Beerenberg performs an automated method for cleaning and inspecting anchor chain at sea.